Construction Quantity Takeoffs & Cost Estimating (DRFT 2102)

Students are introduced to the fundamental principles and methods used in construction quantity takeoffs and cost estimating, with an emphasis on both traditional and Building Information Modeling (BIM) based workflows. Students learn to interpret construction drawings and digital models to accurately quantify materials, labour, and equipment required for construction projects. Through the use of manual methods, spreadsheets, and BIM tools, students gain experience with modern estimating practices used in the construction industry.
Course code: DRFT 2102
Credits: 3.0
Length: 60.0 hours
Course outline: view https://www.vcc.ca/vccphp/courseoutline?subject=DRFT&number=2102

Prerequisites

DRFT 1374 or DRFT 1316 or DRFT 1391 or DRFT 1344.
Loading...

Ask a question